Service Hotline:+86(0)532 8587 1802
Introduce
Z46150-1 full hydraulic tunnel drilling machine performance parameter (plunger pump structure):
主軸轉速(r/min) |
0-2500 |
液壓系統工作壓力MPa |
20 |
主軸扭矩(Nm) |
>290 |
最大工作壓力MPa |
25 |
軸向推力 kN |
>33 |
鉆孔方位角 |
0°~360° |
軸向拉力 kN |
>24 |
井下鉆孔傾角 |
0°~360° |
動力頭行程mm |
850 |
地表鉆孔傾角 |
0°~180° |
電機功率kw |
30 |
電機轉速rpm |
1480 |
電壓V |
380 |
頻率Hz |
50 |
主泵最大壓力MPa |
31.5 |
輔泵最大壓力MPa |
31.5 |
鉆機部件外型尺寸 |
主機體:1630×300×500 動力車:1350×940×1050 |
||
(長*寬*高)mm |
操縱臺:550×450×1150 |
||
鉆機部件重量 |
總重量:1150 kg(主機體:300kg 動力車:490kg 操作臺:112kg) |
Note:
The above drill data are for reference only. If there is any change, you will not be informed in advance. For further technical advice, please contact our sales & technical department.
The relationship between drill depth and borehole diameter and drill pipe material:
Z46150-1 type
鉆孔深度m |
鉆孔直徑mm |
鉆桿直徑mm |
鉆桿材料 |
200 |
36 |
33 |
鋼 Steel |
300 |
46 (AQ) |
43 |
鋁 Aluminum |
180 |
46 (AQ) |
42 |
鋼 Steel |
Note:
The above table data are data for drilling vertically in homogeneous strata, for reference only.
Sweep a sweep of WeChat
Technical support::hundreds of millions of people technology